Case Study: 100-Apartment New Build Handover at Avonside House, Peterborough

Luke Cervino Founder, The After Builders Cleaning Company
Published: 28 January 2026
Avonside House residential apartment building at Fletton Quays, Peterborough

Avonside House is a contemporary multi-storey residential apartment building forming part of the Fletton Quays regeneration scheme in Peterborough. When the developer needed a reliable partner to handle post-construction cleaning across all 100 apartments, they called us.

This is a look at how we approached the project, the challenges we faced, and the results we delivered.

Project at a glance 100 apartments • 65,000+ sq ft • Full sparkle clean • Internal and external windows • Communal areas • Delivered on schedule

Table of Contents


The Brief

Avonside House comprises 100 high-spec new-build apartments, including premium penthouse units, alongside extensive communal circulation areas and shared spaces.

We were appointed by Propiteer Fletton Quays to deliver a full post-construction cleaning and handover preparation programme across the entire building. The scope covered:

  • 65,000+ sq ft of internal residential space
  • Comprehensive window cleaning — internal and external across all elevations
  • Complex high-level glazing on the penthouse apartments
  • Phased delivery aligned with practical completion milestones

The goal was simple: get every apartment handover-ready, on time, without compromising on quality.


Scope of Works

We provided a complete post-build cleaning solution covering every aspect of the development:

Area What We Delivered
Apartments (x100) Full post-construction deep clean to sparkle standard
Kitchens & Bathrooms Sanitisation, polishing, protective film removal
Windows Internal and external cleaning, all floors
Penthouses Specialist high-level glazing cleaning
Floors Deep cleaning, scrubbing, and final polishing
Communal Areas Corridors, stairwells, and shared spaces
What's a sparkle clean? It's the final stage of post-construction cleaning — the highest standard. Every surface is detailed, every window gleams, and the property is ready for occupation or photography. More about clean levels.

Project Challenges

Large-scale new-build developments come with a unique set of challenges. Avonside House was no exception:

1. Volume and Consistency

100 apartments is a lot of ground to cover. Every unit needed to meet the same high standard — no exceptions.

2. Heavy Post-Construction Contamination

New builds leave behind serious mess. We're talking about:

  • Fine construction dust on every surface
  • Adhesive residue and protective films
  • Paint splashes on glazing
  • Plaster and grout haze on tiles

3. Complex Glazing

The building features extensive glazing across multiple floors, including large windows on the penthouse units. High-level window cleaning requires specialist equipment and techniques.

4. Live Construction Environment

We were working alongside other trades, which meant:

  • Phased access to different floors
  • Close coordination with site management
  • Working around ongoing construction activity

5. Tight Deadlines

The developer had firm completion targets. Delays weren't an option.

Why this matters On a project this size, a slip in one area can cascade into delays across the whole programme. We needed to maintain pace while never dropping below handover standard.

Our Approach

We implemented a structured, phased cleaning programme integrated into the overall construction schedule.

Team Deployment

We deployed a 15-person specialist post-construction cleaning team. This gave us the capacity to handle multiple apartments simultaneously while maintaining quality control.

Phased Delivery

Rather than waiting for the whole building to be finished, we worked floor-by-floor:

Phase Approach
Stage 1 Move in as each floor completed construction
Stage 2 Initial builders clean to remove heavy debris
Stage 3 Full sparkle clean once finishes are complete
Stage 4 Final inspection and sign-off

This approach kept us aligned with the construction schedule and ensured apartments were ready as soon as trades finished.

Quality Control

With 100 units to deliver, consistency was critical:

  • Daily quality inspections on every completed apartment
  • Sign-off process before marking any unit as handover-ready
  • Supervisory oversight across all teams

Specialist Equipment

We brought in industrial-grade equipment suited to new-build cleaning:

  • Industrial steam cleaning systems
  • HEPA-filtered vacuums for fine dust extraction
  • Specialist high-level window cleaning kit
  • Professional-grade floor polishing equipment

Results & Performance

Here's what we delivered:

Metric Result
Apartments cleaned 100 (100%)
Internal space covered 65,000+ sq ft
Average daily output 10–12 apartments during peak phases
First-time pass rate 100%
Delays to completion Zero
Safety incidents Zero
The outcome All 100 apartments were delivered to a handover-ready presentation standard. Full building glazing was completed internally and externally, including the complex penthouse elevations. The development transitioned smoothly from construction to residential occupation.

Client Feedback

The site management team and project stakeholders provided positive feedback on:

  • Quality consistency across all units
  • Reliable programme delivery
  • Smooth coordination with other trades
  • Professional approach throughout

Key Takeaways

This project reinforced several principles we apply to every large-scale development:

1. Plan for Scale

100 apartments requires a different approach to 10. We needed the right team size, the right equipment, and the right processes to maintain quality at volume.

2. Integrate with the Build Programme

Working in isolation doesn't work on live sites. We coordinated closely with site management to align our schedule with trade completion.

3. Never Compromise on Quality

It would have been easy to cut corners to hit deadlines. We didn't. Every apartment met the same sparkle-clean standard.

4. Invest in Quality Control

Daily inspections and sign-offs caught issues before they became problems. This is how we achieved a 100% first-time pass rate.


Work With Us

If you're a developer, contractor, or project manager with a multi-unit residential project, we'd be happy to discuss how we can support your handover programme.

We handle projects across London and the wider South East, from individual apartments to large-scale developments like Avonside House.

Get in touch:


Project completed: 2025. Client: Propiteer Fletton Quays. Location: Avonside House, Fletton Quays, Peterborough.

Request a Quote

Please provide your first name.
Please provide your email address.
Please provide a valid email address.
Please provide your phone number.
Please provide the project address.
Please provide the project type.
Please enter your message.

Same-day response guaranteed.

CONTACT

Phone: 0208 058 2037

Email: [email protected]

OFFICE

26, Chelsea Vista, The Boulevard,
Imperial Wharf, London, SW6 2SD

SOCIAL

Find Us in London

Available across all London boroughs

Call Us Get Quote